Close Menu
    Advertise With Us
    Facebook X (Twitter) Instagram
    Saturday, June 21
    Advertise With Us
    Facebook X (Twitter) Instagram
    Greenisthefuture
    • Top Stories
    • Renewables
      • Solar Energy
      • Wind Enegry
    • Electric
      • 2 Wheeler
      • 4 Wheeler
      • Battery
      • Charger
      • Infrastructure
    • Clean Energy
    • Eco Innovator
    • Global
    • Interview
    Subscribe Now
    Greenisthefuture
    You are at:Home » NFR Commissions 306.9 KWp Solar Power Plant in Guwahati, Eyes Rs 30 Lakh Annual Savings
    Renewables

    NFR Commissions 306.9 KWp Solar Power Plant in Guwahati, Eyes Rs 30 Lakh Annual Savings

    DeskBy DeskApril 14, 20252 Mins Read
    Share Facebook Twitter Pinterest LinkedIn Tumblr Email
    NFR Commissions 306.9 KWp Solar Power Plant in Guwahati, Eyes Rs 30 Lakh Annual Savings
    NFR Commissions 306.9 KWp Solar Power Plant in Guwahati, Eyes Rs 30 Lakh Annual Savings
    Share
    Facebook Twitter LinkedIn Pinterest Email

    The Northeast Frontier Railway (NFR) has commissioned a 306.9 KWp solar power plant at the Uzanbazar Water Treatment Plant in Guwahati. The project marks a strategic leap in Indian Railways’ green energy initiatives, aiming to cut down on carbon emissions and operational costs.

    The solar installation, which was officially inaugurated on Thursday, has been developed under the Environment and Housekeeping Management (EnHM) fund. It is designed to generate approximately 928 units of electricity daily, resulting in an estimated annual saving of ₹30 lakh for the railway zone.

    Completed on March 7 at a total cost of ₹2.48 crore, the plant has been engineered to power critical operations at the Uzan Bazar Water Treatment Plant. According to the official statement, its robust electrical network extends to barges and jetties in the area, ensuring seamless energy distribution and efficient water treatment operations.

    The solar power plant is anticipated to lessen the railways dependency on conventional electricity in the next eight years, which is its estimated pay back duration. The plant is said to last 25 years. NFR officials elucidated that this solar venture emphasizes their determination towards sustainable technological development, energy efficiency, and environmentally considerate behavior.

    “This is more than just a solar plant. It’s a vital step in aligning the Indian Railways’ infrastructure with the national vision of a greener future,” the statement added.

    The initiative is part of Indian Railways’ larger plan to integrate renewable energy into its core infrastructure, with the goal of becoming a net-zero carbon emitter by 2030. NFR’s latest green milestone stands as a testament to how public sector enterprises can lead the way in clean energy adoption and climate resilience.

    carbon footprint reduction environment-friendly railway projects green technology in railways Guwahati renewable energy Indian Railways green initiative Indian Railways sustainability NFR solar power plant Northeast Frontier Railway solar energy in Assam solar plant Uzanbazar
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticleHyundai Mobis Unveils Automatic Fire Suppression System for EV Batteries
    Next Article Bihar Accelerates into the Electric Future with 113% Surge in EV Registrations
    Desk

    Related Posts

    India’s Renewable Energy Future Hinges on Massive Grid Investment

    May 22, 2025

    Reliance Industries to Launch Solar Module Factory in 2025, Aiming for Global Leadership

    May 22, 2025

    Inox Green Expands Solar O&M Portfolio with 285 MW Agreements

    May 19, 2025
    Add A Comment
    Leave A Reply Cancel Reply

    Top Posts

    BCCI’s Green Pitch for Sustainable Cricket Future

    February 16, 2025

    Global Push for Sustainability Drives Green Ammonia Production

    March 18, 2025

    WPL 2025: Cricket Scores for Sustainability, Too!

    March 14, 2025

    Delhi EV Policy 2.0 Targets 95% Electric Vehicles by 2027

    March 11, 2025
    Don't Miss

    India Poised to Surpass 2030 Emissions Intensity Target, New Analysis Reveals

    By Aditya PandeyMay 22, 2025

    India is on track to surpass its 2030 climate target of reducing the emissions intensity…

    Juniper Green Energy Appoints Ankush Malik as CEO to Drive Renewable Growth

    India’s Renewable Energy Future Hinges on Massive Grid Investment

    Reliance Industries to Launch Solar Module Factory in 2025, Aiming for Global Leadership

    Newsletter

    Subscribe for Updates

    Get the latest updates from GreenIsTheFuture

    About Us

    Green technology can be used to reduce pollution and waste products of traditional industrial processes. In addition to reducing the negative effects on the natural environment, these technologies can also use resources more efficiently.
    Email Us: info@greenisthefuture.in

    Facebook X (Twitter) YouTube WhatsApp
    Quick Links
    • About Us
    • Our Team
    • Privacy Policy
    • Advertise With Us
    • Terms & Conditions
    • Subscription
    Newsletter

    Subscribe for Updates

    Get the latest updates from GreenIsTheFuture

    © 2025 Designed by GreenIsTheFuture.

    Type above and press Enter to search. Press Esc to cancel.